Client and building owner: TEDi GmbH & Co. KG, Dortmund
Architecture: Spital-Frenking + Schwarz Architekten I Stadtplaner, Dortmund
Detail planning/construction Textile facade: Typico GmbH, A-Lochau
Completion: 2022
THE LONGEST 3D MEMBRANE FAÇADE IN THE WORLD
Frontside View 381 textile façade fabric in an ambitious project with many challenges. Inspired by a multidimensional curtain wall that textile façade specialist Typico GmbH had realised for a music school. The architects came up with a façade concept that envisaged a curtain façade made up of differently shaped waves, the curves of which were parallel at the top and bottom.
Material Textile facade Serge Ferrari Frontside View 381-3121 interference grey
Textile facade format 360 m long / 11 m high, approx. 4000 square metres
Tensioning technology Typico K45, KP-1 & KP-2 round keder tensioning mechanism
Photocredits ©Philip Kistner Architekturfotografie